PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Rebar Mats at Elev. 4-Stair -2 Facing South (800x600).jpg Excavation at Elev. 7 Footings Facing East (800x600).jpg Tying rebar mats at Elev. 4-Stair -2 Facing West (800x600).jpg Closing up the wall forms at Monumental Stairs Facing South (800x600).jpg Closing up the wall forms at Monumental Stairs Facing South-West(800x600).jpg Striping Shear wall panels at Elev. 1,2,3 Facing West.jpg Tying rebar mats at Elev. 4-Stair -2 2nd Floor Facing South (800x600).jpg Caulking Curtain Wall Mockup Facing MAST Trailer (800x600).jpg
Previous pageNext page Closing up the wall forms at Monumental Stairs Facing South (800x600)
Closing up the wall forms at Monumental Stairs Facing South (800x600)